Regarding the theme work for environment OHI INTERNATIONAL already extended its hand to almost every sector of Environment. The major service areas of are as follows:
  T
     ENVIRONMENTAL CONSULTANCY SERVICES
     ENGINEERING SERVICES
     ENVIRONMENTAL RESEARCH
     Environmental Consultancy
     Papers Required to Get Environmental Clearance of Your Industry.
     Water and Wastewater Treatment Plant(ETP, STP, WTP & CTP)
   
  ENVIRONMENTAL CONSULTANCY SERVICES
 
  • IEE, EMP & EIA Report Preparation
  • Environmental Monitoring
  • Site and Environmental Clearance for industry.
  • Analysis of wastewater
  • Environmental Research & Training
   
  ENGINEERING SERVICES
 
  • Drawing and Design of ETP, STP and WTP
  • Electro-Mechanical Installation of ETP, STP and WTP
  • Erection, Commissioning of ETP, STP and WTP
  • Re-design and modification of existing non functional ETP, STP and WTP
  • Any technical explanation of ETP, STP and WTP
   
. 3.ENVIRONMENTAL RESEARCH
 
  • Sludge Management
  • River and Floodplain Management
  • Solid Waste Management
  • Low cost Water Treatment Plant Development
   
   Environmental Consultancy
 

You can relay on us for your total consultancy services for getting environmental clearance from DoE , Bangladesh . We will help in top to bottom. Site clearance for your proposed industry, preparation of environmental management plan for your industry and finally environmental impact assessment study and report preparation will be done by us. Please contact us before starting any industry in any location and take our help. We will do every thing for you at minimum cost but remember you will get maximum services from us.

   
   Papers Required to Get Environmental Clearance of Your Industry.
 

S. No.

Paper

1.

Application from of Department of Environment

2.

Project profile/feasibility report/general information

3.

NOC from any of the above

Local Authority

Or Local Ward Commissioner/Chairmen

Or Dhaka/Chittagong/Khulna/Rajshahi Development Authority

4.

Mauja Map

5.

Factory layout plan+ Machinery layout plan

6.

Detailed process flow diagram

7.

Paper of land occupied by industry, Land mutation certificate

8.

Registration of Board of Investment

9.

Trade License, TIN certificate

10.

Report such as if available

IEE report/EMP report/EIA report

11.

Treasury Chalan to Director General of DoE according to the flowing rate

12.

List of Machinery and Raw materials.

13.

Analysis report of your wastewater before and after treatment

 
  COSTING :
 

Project cost

Amount of Chalan

Renew fee (Tk)

1-5 lac

15,00

375

5-10 lac

3,000

750

10-50 lac

5,000

1,250

50 lac-1 core

10,000

2.500

1-20 core

25,000

6,250

20-50 core

50,000

12,500

>50 core

100,000

25,000

   
 

Use the following code number in chalan form:

   
 